Loading...
Loading...

Three schematic views: plan layout, section A–A with flue gas path, and P&ID hydronics. Click any item in the list to highlight it in the drawing.
Assumptions: fuel prices from BALTPOOL SM2, LEA, and VERT range midpoints (2026-10); 2 100 full-load hours/year and 10% sizing reserve; operating cost 3% of capex/year plus auxiliary electricity at 0,20 €/kWh. Exact calculation prepared from your utility bills.
GK-2000 · 2,0 MWWalking-Floor bunker, multi-stage flue filtration
SCADA supervisory control
Your inquiry goes directly to our lead engineer. We prepare an itemised estimate within 24 hours on business days (Mon–Fri 8:30–17:30).